← Theme Verification / Operational Portal (BVL) Tailwind v4.0
PLANTS

Bayview Landfill

Online
OCO Garrett Gordon
WATCH Ren Rich | 9h
ONSITE Kevin Brown | 9h
Ujal Watson | 6min
Garret Gordon | 5min
→ Onsite
KB
Kevin Brown
07/11/26 23:16 (9h ago)
Safety
→ On Watch
RR
Ren Rich
07/11/26 23:29 (9h ago)
Operational
Plant Status
Online
OCO
Garrett Gordon
Log Update

Plant flowing 1045scfm. GCCS GHS Flow Rate 1251 SCFM, Vacuum PV 36.8 AT090 0.00% O2, KR O2 0.02%, KR CH4 98.9%

💬 General
RR
Ren Rich
07/12/26 5:01 (5h ago)
Operational
Plant Status
Down, Trip
Log Update

At 1942 local the plant EQ tripped on code TRP_REC_001 for Discharge Pressure Hi Hi. SO notified.

RR
Ren Rich Initiated a remote reset of the EQ.
07/12/26 5:50 (4.5h ago)
💬 General
OP
Operator Log
07/12/26 6:01 (4h ago) 1 Edit (4h ago)
Operational
Plant Status
Online
Log Update

TRP: Selling gas through angi 1 & 2 Time offline: 19:42 local Time online 20:22 local Total time out of sales: 40m

→ Onsite
UW
Ujal Watson
07/12/26 10:13 (6min ago)
Safety
→ Onsite
GG
Garret Gordon
07/12/26 10:14 (5min ago)
Safety